Dynamics GP 9.0 and 10.0 allows you to schedule backups from within the application. You'll need to be logged in to GP as an administrator and you'll need to be on the server.
Go to File> Backup [v9] / Maintenance > Backup [v10]
Enter the system password if you've set one.
When the backup window opens, pick Schedule.
- Name the backup schedule
- Pick the database to backup or backup the system databases
- Enter the backup path (this must be a path on the local server)
- Select the days to backup and the time. The time is entered is in a 24 hour format
- Pick how often to delete old backups
- Click Save. SQL Agent MUST be running when you click save
No comments:
Post a Comment